13 NEWSLETTER SACO

13 NEWSLETTER SACO

13 NEWSLETTER SACO

Product catalog summary
Introduction
This newsletter provides updates on SACO's activities and events globally, focusing on cargo handling systems and recent projects.

New DHL Brussels Hub
DHL's new hub at Brussels Airport began operations in July 2017, significantly increasing capacity from 12,000 to 39,500 shipments per hour. SACO contributed to upgrading DHL's ULD handling standards, setting a new global benchmark.
  • Scope of Supply: 11,000 m2 Castor Decks, 250 Roller Decks, 10 Truck Docks, 4 ULD Hoists, 28 Automated Airlocks, PLC Controls, and SCADA.

Swissport Cargo in Chicago
Swissport Cargo opened a new warehouse at Chicago O'Hare Airport with an automated ULD handling system, accommodating over 120 ULDs.
  • Scope of Supply: 1,500 m2 Castor Decks, 33 Roller Decks, 6 Right Angle Decks, 3 Truck Docks, 2 Work Stations, PLC Controls.

TNT Marly-la-Ville, France
SACO supplied a ULD handling system for TNT's logistics center near Charles-de-Gaulle Airport, capable of processing 18,000 parcels per hour.
  • Scope of Supply: 400 m2 Castor Decks, 8 Roller Decks, 6 Truck Docks, 6 Speed Doors, PLC Controls.

WFS Milan, Malpensa Airport
SACO was contracted to equip WFS's new cargo terminal at Milan Malpensa Airport, opening in November 2017.
  • Scope of Supply: 1 Truck Dock (10 ft), 1 Truck Dock (20 ft), 230 m2 Castor Decks, 3 Work Stations, PLC Controls.

New Projects with DHL
Due to successful collaborations, SACO has been awarded new projects at various airports including Sevilla, Gdansk, Basel, Marseille, Cologne, Madrid, Milan, and Venice.

Upcoming Events 2017/2018
SACO will participate in several industry events, including conferences in Budapest, Geneva, Munich, Istanbul, Dallas, Palm Springs, Shanghai, and Toronto.
See more

Catalog excerpts

13 NEWSLETTER SACO-1

AIRPORT EQUIPMENT Cargo Handling Systems With this edition of our Newsletter we would like to update you on our activities and events around the globe. Please feel free to contact us should you require any further information or support. world's leading international express service provider started operating from its new hub at Brussels airport in July 2017. This will further strengthen the position of Brussels within the European and worldwide DHL network. This 114 million Euro investment is expected to triple the hub's capacity from 12,000 to 39,500 shipments per hour. Thanks to the state-of-the-art ULD and material handling system technologies, DHL will be able to respond to the expected fast growth of the international express shipments. To improve and modernise its ULD handling standards, DHL Brussels together with SACO radically upgraded the existing DHL engineering specifications. Backed by DHL operations, maintenance, technical and safety experts, these specifications will now serve as base for a new global standard. SACO'S SCOPE OF SUPPLY ✓ 11000 m2 Castor Decks ✓ 250 Reload and offload Roller Decks ✓ 10 Truck Docks (10-ft & 20-ft) ✓ 4 ULD Hoists ✓ 28 Automated airlocks for landside/airside transition ✓ PLC Controls and SCADA warehouse at Chicago O'Hare Airport in July 2017, featuring an automated material handling system. The new 12,900 m2 facility is at the North Cargo Area of Chicago O'Hare Airport and will set new benchmarks with the first automated ULD handling system in the region. The system supplied by SACO can accommodate over 120 10-ft ULDs at a time. All ULDs can be handled to the highest industry standards without touching the floor. SACO'S SCOPE OF SUPPLY ✓ 1500 m2 Castor Decks ✓ 33 Motor Powered Roller Decks ✓ 6 Right Angle Decks ✓ 3 Truck Docks (20-ft) ✓ 2 Build up/ Break Down work stations ✓ PLC Controls Swissport's new facility has 36 truck docks, and features adjacent aircraft parking with in-ground fueling and power units to shorten aircraft turnaround times. SOLVING YOUR CARGO HANDLING CHALLENGES www.saco.aero

 Open the catalog to page 1
13 NEWSLETTER SACO-2

SACO has successfully supplied and commissioned the ULD handling system for TNT in Marly-la-Ville. TNT built this logistics centre in Marly to benefit from its strategic location near Charles-de-Gaulle (CDG) and the FedEx hub at the airport. The new state-of-the-art logistic centre will deliver and receive ULD's to/from trucks and will be able to treat 18,000 parcels per hour. SACO'S SCOPE OF SUPPLY ✓ 400 m2 Castor Decks ✓ 8 Roller Decks for offload/reload with integrated weighing systems ✓ 6 Truck Docks (10 ft) ✓ 6 Speed doors and fencing ✓ PLC controls WFS MILAN, MALPENSA AIRPORT (MXP) ‘“CP...

 Open the catalog to page 2

Archived catalogs

*Prices are pre-tax. They exclude delivery charges and customs duties and do not include additional charges for installation or activation options. Prices are indicative only and may vary by country, with changes to the cost of raw materials and exchange rates.