Catalog excerpts
AUXILIARY POWER UNIT Designed to supply air to engine starters and environmental control systems
Open the catalog to page 1Possible applications of APU Safír 5K/G MI 40 Main parameters Rated electrical power Electrical power by overload Bleed air extraction max Fuel consumption Range of operation Main features H=0 m T=15 °C 40 kVA 60 kVA 28.3 kg /min max. 55 kg/hour −55 °C ÷ + 60 °C 0 ÷ 6,000 m Dimensions and weight Length (with AC generator) Width × Depth Weight (with AC generator (including air inlet and air bleed system) • Simultaneous supply of electric power and compressed air • Unlimited number of main engine starts • Continuous operation lasting 6 hours • High reliability of APU operations • Possibility...
Open the catalog to page 2All PBS VELKA BITES catalogs and technical brochures
-
PBS JOURNAL
9 Pages
-
PBS_APU Safir 5L
2 Pages
-
PBS APU Safir 5KG Z8
2 Pages
-
PBS Turbojet engine TJ40-G2
2 Pages
-
PBS Turbojet engine TJ80
2 Pages
-
PBS Turbojet engine TJ100
2 Pages
-
PBS Turbojet engine TJ150
2 Pages
-
PBS Turboshaft engine TS100
2 Pages
-
PBS ECS systems
2 Pages
-
PBS ECS-M1V
2 Pages
-
PBS Starter-generator
2 Pages
-
Two-channel Ignition Device
8 Pages
-
PBS_Turbine blades catalogue
16 Pages
-
PBS Turbine Blades
2 Pages
-
PBS Spinner discs
2 Pages
-
PBS Precision Casting
4 Pages
-
PBS KNEE REPLACEMENTS
2 Pages
-
SAFIR 5L
2 Pages
-
SAFIR 5K/G Z8
2 Pages
-
SAFIR 5K/G MIS
2 Pages
-
TJ80 TURBOJET ENGINE
2 Pages
-
TS-100-turboshaft-engine
2 Pages
-
TP-100-turbopropeller-engine
2 Pages
-
TJ-100-turbojet-engine
2 Pages
-
TJ-40-G2-Turbojet-Engine
2 Pages
-
TJ-40-G1-Turbojet-Engine
2 Pages