

Catalog excerpts

PRIMER 9014-B SPECIAL COATINGS Product information Tri-components polyurethane adhesion promoter. It is necessary to apply the 9014-B before applying MAPCOAT anti-erosion system. Base 9014-B Hardener / Catalyst 9014-B Thinner P Qualified in accordance with: French Air Force : DCAN N°060/AERO/61 Embraer : MEP 10-124 Product information mentioned in the technical datasheet is given for information purposes and can differ from requirements of specifications above. In that case, customer requirements are valid for your application. Physical properties THEORETICAL COVERAGE 21 m²/kg for 20 µm (0.8 mils) dry (base and hardener undiluted) DRY FILM WEIGHT 1.5 VOC 450 g/L (Base+Hardener ISO11890-1 and ASTM D3960) COLOR White SHELF LIFE / STORAGE 24 months for the base and the hardener and 48 months for the thinner stored between 5°C and 35°C (41°F and 95°F) in full and sealed original packaging. GLOSS LEVEL Not applicable because the application of MAPCOAT system takes place before the drying of 9014-B Primer. NOTES Gloss levels have been determined using glossmeter with an angle of incidence of 60°C. The theorical consumption value doesn’t take into account the transfer efficiency for spray application Surface preparation The primer 9014-B should be applied, for example, on the surfacer P28, when the substrate is a composite, or on an anticorrosive primer such as AEROPRIM 530 when the substrate is treated aluminum alloy. Contact us for information on uses on other metallic structures, surface treatments or paints. All recommandations mentioned above are given for information. Technical Data Sheet N° 16 - Edition (01/2020)
Open the catalog to page 1
PRIMER 9014-B SPECIAL COATINGS SPRAY APPLICATION MIXING RATIO Mixing ratio by weight 100 54 5 à 15 Base Hardener / Catalyst Thinner MIXING PROCEDURE Ideally, the unmixed products should be stored between 18°C and 25°C (64°F and 77°F) for 24 hours before use The 9014-B base should be mixed for 10 minutes in a pneumatic or oscillating mixer before use. Mix the base and the hardener until the mixture is homogeneous. Then add the thinner and mix. The mixture must be made at a temperature between 15°C and 35°C (60-95°F). It is recommended to sieve the mixture through a 120-150µm (5-6 mils)...
Open the catalog to page 2
PRIMER 9014-B SPECIAL COATINGS Drying times Recoatable NOTE Drying times have been determined using tests pieces of a thickness < 2mm for 20µm (0.8mils) of dry film. Recoatable by MAPCOAT top coat. *N.A. : Not applicable Defects & corrections Health & Safety In the event of a defect, contact your Quality Department. In case of running, rejects or numerous inclusions: remove the paint with a lint free cloth and P thinner, and start again the process of application and reactivation of the previous coat. See the product Safety Data Sheet. The MSDS are available through our website...
Open the catalog to page 3All MAPAERO catalogs and technical brochures
-
PRIMER P60-LC
4 Pages
-
PRIMER P60-2K
4 Pages
-
Topcoat XS4201
4 Pages
-
P65-HG
3 Pages