1. Catalogs
  2. LJP INDUSTRIES
  3. NITROGEN NATO KIT

NITROGEN NATO KIT

NITROGEN NATO KIT

NITROGEN NATO KIT

Product catalog summary
Destination: The NATO Nitrogen Kit is designed for pneumatic inflation using nitrogen on damping elements, with pressure that is measured and adjusted accordingly.
Usage: The kit is used to inflate components like strut absorbers with nitrogen at a controlled and measured pressure.
Description: The pneumatic system utilizes a traditional nitrogen bottle. The gas pressure is reduced to the required working pressure for the task. The operation is managed through flexible hoses, connectors, and a three-way valve.
Use and Precautions: Gas supply should only commence when all connections are secure and the gas reduction valve is unscrewed. It is crucial to select the appropriate gauge. Monitoring is conducted solely via the three-way valve. After completing the task, the gas supply should be turned off, and the system purged before removing accessories.
Maintenance: Tools must be kept clean and appropriate tools should be used without applying excessive force. Gauges should match the pressures required for testing. The pump should be refilled before the next use, and oil from purges should be stored for retreatment. Tools are subject to periodic checks.
See more

Catalog excerpts

NITROGEN NATO KIT-1

DESTINATION: Ensemble NATO destiné à assurer un gonflage pneumatique à l’azote sur des éléments d’amortissement, et sous une pression mesurée et ajustée. USAGE: Nato assembly is used to inflate with nitrogen all elements such as strut absober under an ajusted and measured pressure. DESCRIPTION: EN PNEUMATIQUE La source gazeuse est une bouteille d’azote traditionnelle. Le gaz est détendu et amené à une pression en accord avec l’intervention en cours. Par le biais des flexibles de liaison et des raccords et au travers de la vanne trois voies, vous piloterez l’intervention. DESCRIPTIONS: PNEUMATIC SYSTEM The gas supplied is from a traditional nitrogen bottle. Nitrogen pressure is reduced up to the working pressure in accordance with the action to perform. Through the flexible hoses and connectors as well with the 3 ways valve you monitor the action. VALISE NATO AZOTE 18, rue de la place - BP 39 77412 CLAYE - SOUILLY CEDEX Tel: 01.60.26.16.72 - Fax: 01.60.26.35.56 Contact: [email protected]

 Open the catalog to page 1
NITROGEN NATO KIT-2

EMPLOI ET PRECAUTION EN PNEUMATIQUE L’alimentation en gaz n’est faite que quand tout est parfaitement connecté et la détende gazeuse dévissée. Attention au choix du manomètre! Le pilotage ne se fera que par vanne trois voies. Travail terminé, on ferme l’arrivée du gaz, sur la bouteille on purge les circuits. Ce ne sera qu’après cette dernière manipulation que l’on démonte les accessoires. USE AND WARNING PNEUMATIC ACTION Supply of gas start only when all connections are secured and gas reduction unscrewed. Be careful with the choice of gauges! Monitoring is only performed with the 3 ways valve....

 Open the catalog to page 2
*Prices are pre-tax. They exclude delivery charges and customs duties and do not include additional charges for installation or activation options. Prices are indicative only and may vary by country, with changes to the cost of raw materials and exchange rates.