Project Overview
Heavy Structures undertook the structural design, material supply, and erection for the expansion of Republic Engineered Products' facility in Canton, Ohio. The project was executed using fast-track design-build processes, achieving a dried-in building within nine months.
Building Specifications
  • Dimensions: 155'x285'x125', 65'x200'x65', and 80'x125'x45' eave heights.
  • Four overhead cranes: one 325-ton, two 75-ton, and one 12-ton capacity.
  • Crane maintenance penthouse with a 26½ ton monorail hoist.
  • Crane girders span 44' to 66' at 90' elevation above the finished floor.
  • Eave heights range from 125' to 130' for crane clearance.
Structural Details
  • Total of 1,800 tons of structural steel used.
  • Crane girders weighed between 10 to 38 tons each, designed without splices to reduce erection time.
Construction Process
  • Steel was staged off-site due to restricted site conditions and brought in as needed.
  • Primary steel erection was closely coordinated with the construction of caster foundations and furnace flume.
See more

Catalog excerpts

HS110 Republic-1

Project Profile Republic Engineered Products, Inc. Canton, OH End Use: Furnace and Caster Building Republic Engineered Products, Inc. 155'x285'x125' Eave Hgt. 65'x200'x65' Eave Hgt. 80'x125'x45' Eave Hgt. eavy Structures supplied the structural design, building materials and erection for this expansion to the Republic Engineered Products facility in Canton, Ohio. Using fast-track design-build processes, the building was dried-in in only nine months. The building houses four overhead cranes; one with a capacity of 325 tons, two with capacities of 75 tons each, and one carrying 12 tons. A crane maintenance penthouse services the three large cranes and supports a 26½ ton monorail hoist. Crane girders span from 44' to 66' and support the cranes at an elevation of 90' above finished floor. Building eave heights of 125' to 130' were required to provide clearance above the cranes. The project required 1,800 tons of structural steel, including crane girders that weighed from 10 tons to 38 tons each. The crane girders were designed without splices, reducing the amount of erection time required. Erection services were provided through Heavy Structures. Restricted site conditions resulted in the steel being staged in an off-site laydown area and brought in as-needed. The primary steel was erected in close coordination with the nearly concurrent construction of the caster foundations and furnace flume below. 1540 Genessee • Kansas City, MO • 64102 • 816.245.6500 • www.heavystructures.com

 Open the catalog to page 1

All Heavy Structures catalogs and technical brochures

  1. HS171

    1  Page

*Prices are pre-tax. They exclude delivery charges and customs duties and do not include additional charges for installation or activation options. Prices are indicative only and may vary by country, with changes to the cost of raw materials and exchange rates.