Boeing 757 refuelling steps extra step
5Pages

{{requestButtons}}

Catalog excerpts

Boeing 757 refuelling steps extra step - 1

CUSTOMER: Standard SPECIFICATION NO: 697 SUBJECT: 757 Refuelling Steps + Extra Step Flightline Support Limited Lakeside Industrial Park, Cotswold Dene, Standlake, W itney, Oxon OX29 7PL www.fsluk.com Tel +44 (0) 1993 776564 Fax +44 (0) 1993 778953

Open the catalog to page 1
Boeing 757 refuelling steps extra step - 2

CUSTOMER: Standard SPECIFICATION NO: 697 SUBJECT: 757 Refuelling Steps + Extra Step Page 2 Dimensions Platform Height (lowered) 1520mm Platform height (fully elevated) 2120mm Overall width 1660mm Length 3620mm Weight 500Kg (Shipping) 3650(L) X 1660(W) X 2650(H)mm Chassis construction. Aluminium and stainless steel construction. Designed to be robust, but light weight and easily manoeuvred by a single operator. Stability. Manufactured with front mounted out-riggers to guarantee stability whether working with the platform in the lowered or fully elevated position. Out- riggers are a bolted...

Open the catalog to page 2
Boeing 757 refuelling steps extra step - 3

CUSTOMER: Standard SPECIFICATION NO: 697 SUBJECT: 757 Refuelling Steps + Extra Step Pipework, fittings, Hoses and couplings 1 x Avery Hardoll FCMY 107M5L coupling will be fitted for connection to the refuelling vehicle. The coupling will be fitted at approximately 700mm above ground level. All pipework is fabricated from 2”NB stainless steel tube. A de-pressurisation / sample valve is fitted adjacent to the hose coupling point. Refuelling hoses are 2” Elaflex to EN1361 and hose ends are terminated with Spanfix clamps and appropriate screwed fittings. Certificate of conformity and hose...

Open the catalog to page 3
Boeing 757 refuelling steps extra step - 4

CUSTOMER: Standard SPECIFICATION NO: 697 SUBJECT: 757 Refuelling Steps + Extra Step Operation Amber reflectors will be fitted along the chassis sides, white on each side at the front and red triangle reflectors shall be fitted on either side at the rear for night-time operation. The 757 refuelling steps are approved for towing at speeds up to 20kph and for operation in wind speeds up to 70kph Labels and marking Each unit shall be fitted with the following labels fixed to the chassis frame. An identification plate with contract number and date of manufacture. Information plate with: Towing...

Open the catalog to page 4
Boeing 757 refuelling steps extra step - 5

CUSTOMER: Standard SPECIFICATION NO: 697 SUBJECT: 757 Refuelling Steps + Extra Step

Open the catalog to page 5

All FLIGHTLINE SUPPORT LTD catalogs and technical brochures